Supply Readiness
Nominal82%
14:37Z
Supply Readiness
Nominal82%
14:37Z
Infrastructure Readiness
Warning69%
14:37Z
Assets Tracked
Live20
14:37Z
Stockout Risk
Warning14 days
14:33Z
Critical Alerts
Critical4
14:31Z
Bridge load class mismatch marked the central heavy convoy crossing unavailable.
North hub fuel readiness is below buffer for the next movement window.
Medical pack temperature variance requires monitoring before transfer to HUB-N3.
Inbound convoy queue at HUB-N3 exceeds planned gate throughput.
RD-09 sensor and inspection reports show rutting on the western service approach.
Mesh signal quality is degraded across the western route segment.
PUMP-07 vibration readings indicate seal wear before floodwater transfer.
GEN-14 fuel coupling evidence confidence dropped after field transfer.
South depot collapsible tank reserve is below the corridor surge threshold.
East staging hub needs additional rapid repair compound before Route Delta dispatch.
| Asset ID | Type | Risk | Inspection |
|---|---|---|---|
| BRG-14 | Bridge | Critical | 14:13Z |
| BRG-22 | Bridge | Warning | 13:57Z |
| RD-09 | Road | Warning | 13:58Z |
| RD-18 | Road | Nominal | 14:02Z |
| DEPOT-GATE-N3 | Depot | Degraded | 14:04Z |
| DEPOT-GATE-S2 | Depot | Nominal | 14:16Z |
| SNS-B17 | Sensor Node | Limited | 14:22Z |
| SNS-R09 | Sensor Node | Warning | 14:25Z |
| HUB-N3 | Mobile Depot | Medium | 14:30Z |
| PUMP-07 | Pump Unit | Degraded | 14:24Z |
Bridge Route Delta unavailable
CriticalCentral heavy convoy crossing moved to engineering hold.
North depot gate constrained
CriticalHUB-N3 inbound queue exceeds planned gate throughput.
Fuel threshold breached
WarningHUB-N3 reserve buffer dropped below planned movement threshold.
TRK-4921 axle forecast degraded
CriticalMaintenance risk added to LOG-12 route plan.
RD-09 pavement confidence degraded
WarningWestern service approach requires field inspection.
Pump unit vibration above limit
CriticalPUMP-07 seal inspection recommended before floodwater transfer.
Water tank reserve below surge line
WarningSouth depot tank reserve below corridor surge threshold.
Ring-road comms relay requested
WarningPortable antenna mast assigned to western route segment.
Route Alpha recommended
RecommendedRoute engine selected infrastructure-aware reroute for LOG-12.
Route Echo fuel option prepared
RecommendedFuel-optimized option staged for the next movement window.
Repair compound allocation needed
InfoEast staging hub allocation generated for Route Delta.
Medical demand trend monitored
InfoHUB-N3 trauma consumables remain inside current buffer.